Proud: the family room remodel we did 3 years ago. I still absolutely love it.
Not so happy about: the upstairs bathroom needs to be totally gutted. We did the family room/ half bath in 2018; new furnace/ AC & whole house generator in 2019. The upstairs bath was planned for 2020. Put on hold by the lock down. Then we had a leak in the basement wall & ended up doing an unplanned remodel there. Fixed the wall, purged a ton of stuff, new carpet, shelving, bookcases, new recliner & a new 55 inch TV. DH retired in February, so now he has a place to hang out. But we still haven’t gotten to that upstairs bathroom. I’m a little nervous about supply chain issues. We intend to use the same contractor we used for our family room. I assume they wouldn’t start the project without all the materials being available. I have been thinking it’s time to actually get a contract signed. They are a very popular company that normally is booked 4-6 months out. Last I heard they were having trouble getting more crews, so I’m afraid it might be even more than 6 months before they could start our project.