Im really curious how they are going to connect TSL to SGE. It seems like there is zero work occurring in that spot right now.
There will be gates much like the checker and popsicle stick gates in the TSMM exit.
This image appears to show the pathway that will connect (above the arrow, which is pointing to a dead tree). My guess is this area will be re-done so you won’t see the access road that is currently between the lands.
Will guests be able to access TSL directly after leaving SWGE? Seems like a tough transition if they make this possible. I can see people exiting SWGE and then making their way towards the Pixar Place then entering TSL through the current entrance. Thoughts?There will be gates much like the checker and popsicle stick gates in the TSMM exit.
Why wouldn’t they be? Maybe opening weekend they’ll do things differently but you will exit into TSL.Will guests be able to access TSL directly after leaving SWGE? Seems like a tough transition if they make this possible. I can see people exiting SWGE and then making their way towards the Pixar Place then entering TSL through the current entrance. Thoughts?
Will guests be able to access TSL directly after leaving SWGE? Seems like a tough transition if they make this possible. I can see people exiting SWGE and then making their way towards the Pixar Place then entering TSL through the current entrance. Thoughts?
I was there on Monday, and they had asphalt paving machines behind the walls and they were not there a few days earlier. They were lined up along the fence line of the canal. I assume they are getting ready to pave this week. The bus station roof structure closest to the active bus loops was not done painting but was close. Looked like they had to finish touching up the blue color along the edge of the white on about 50% of the structure closest to the active loop. The far loop closest to the canal looked finished, at least the parts visible.This almost has to be ready to open full tilt for the buses. Looks like it may need top layer asphalt and striping and ready to go.