Has the majority of the construction at MCO been completed yet? Being down to one tram when I was last there in Sept was a little inconvenient as were all of the details and adjusted footpaths. Thanks in advance
 
Which airline?

The land-side drop off area on side B is complete. Not sure about the A side.

Going to the air-sides, they have reconfigured the security check points on the west end (gates 1-59). I don't recall anything happening on the east end (gates 70-120).
 
Which airline?

The land-side drop off area on side B is complete. Not sure about the A side.

Going to the air-sides, they have reconfigured the security check points on the west end (gates 1-59). I don't recall anything happening on the east end (gates 70-120).
Hi it would be Jet Blue on the B side. It was a mess in Sept. I think the tram is back fully at least.
 